home *** CD-ROM | disk | FTP | other *** search
- This is only a rough draft - Megan 04/20/92
-
- The IPLPDN WG made the following progress:
-
- o Andy Malis lead a careful review of the "IP over X.25" draft. All
- remaining issues were resolved, and Andy volunteered to incorporate
- the modifications in the weeks after the IETF meeting. The revised
- draft will be made available, and, if there are no objections,
- the chair will submit the final draft to the IESG and IAB for
- release as an RFC on the standards track.
-
- o The status of the "IP over Circuit ISDN" draft was discussed. No text
- had been generated during the interim, but Brian Lloyd volunteered to
- write a first draft.
-
- o Work on parameter negotiation for Frame Relay Permanent Virtual
- Circuits (PVCs) was reviewed. To avoid unnecessary duplication of
- the work done for Point-to-Point Protocol (PPP), the group
- agreed to coordinate this work with that of the PPP Extensions
- Working Group.
-
- o Paul Tsuchiya presented an expansion of the "shortcut" approach
- to address resolution. Issues were uncovered, particularly an
- issue concerning security, which Paul volunteered to address in
- a future revision of the draft.
-
- Before adjourning, the group agreed that more time would be required
- at the next IETF meeting.
-